File 03

Public

File 03

2019

Folding 14 internal tools into one operations console

Sector

Fortune 500 logistics

Scale

~6,000 operators

Role

Senior Designer

Team

3 Design · 20 Eng

Duration

14 months

Client

Under NDA

30-second read

For hiring teams

Mapped 14 tools to the 6 jobs operators actually do, then designed for the jobs.

Built the company’s first design system to make consolidation possible.

New-hire training went from 2 weeks to 3 days.

This work is public, but internal data is still blurred out of respect for the operators.

Fig. 1 — Abstracted interface

Context

Operators switched between fourteen internal tools to move one shipment. Each tool had its own login, its own vocabulary, and its own idea of what a shipment was.

Constraints

—

Zero downtime: the warehouses run 24/7.

—

Tools were owned by six different engineering teams.

—

Operators were measured on speed, so any change had to be faster on day one.

Decisions

Decision

Rebuild the tools or reorganise around jobs?

Reskin all 14 tools

Rejected

Six job-based workspaces

Chosen

Operators think in jobs, not systems. Matching their mental model removed most of the switching.

Decision

Big-bang launch or gradual?

Big-bang launch

Rejected

One workspace at a time, per warehouse

Chosen

It let us retire tools as we went and kept every rollout small enough to roll back.

Outcome

9

Tools retired in the first year

3 days

New-hire training, down from 2 weeks

1

Design system, still in use

Reflection

The design system was the real product. I’d staff it as one from day one.